If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
7/9/03 - OT
all painting done (not all walls stamped, but looks good), 1/2 the floor
tile put down. Wahoo!! DH will cut the odd shaped tiles tonight, and hopefully we will be able to move everything in after DS goes to bed tonight Larisa |
Ads |
Thread Tools | |
Display Modes | |
|
|