7/9/03 - OT
all painting done (not all walls stamped, but looks good), 1/2 the floor
tile put down. Wahoo!! DH will cut the odd shaped tiles tonight, and hopefully we will be able to move everything in after DS goes to bed tonight Larisa |
All times are GMT +1. The time now is 11:47 AM. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
CraftBanter.com